Use this shed foundation calculator to estimate the concrete or gravel needed for any shed pad. Built around standard shed sizes (8×8, 8×10, 10×12, 12×16) and the typical 4-inch slab thickness. Includes 10% waste allowance and bag-vs-ready-mix breakeven guidance.

Concrete

Length & width units
Thickness units

You need

1.36cubic yards

Bagged equivalent: 82 × 60 lb bags or 62 × 80 lb bags.

Cubic feet
36.67
Cubic meters
1.04
60 lb bags
82
80 lb bags
62

Formula

Volume (yd³) = Length(ft) × Width(ft) × Thickness(ft) ÷ 27

How to use this calculator

  1. Enter shed dimensions. Standard sizes: 8×8 (64 ft²), 8×10 (80 ft²), 10×10 (100 ft²), 10×12 (120 ft²), 12×16 (192 ft²).
  2. Set thickness. 4 in for storage and small workshop sheds; 6 in if storing heavy equipment or tractors.
  3. Pick units. Imperial (ft + in) is standard for U.S. sheds. Metric option available.
  4. Read the result. Cubic yards (for ready-mix delivery), 60lb and 80lb bag count (for bagged pours), and total project cost when price is entered.

Formula

Volume (yd³) = Length × Width × Thickness ÷ 27

Worked example

A 10 × 12 ft × 4 in slab for a shed pad: 1.48 cubic yards (40 ft³). For a bagged pour, that's about 90 bags of 60-lb pre-mix or 67 bags of 80-lb. Most shed pads are bagged because the volume is below the ready-mix short-load threshold.

Common project sizes

Quick reference for the most common shed foundation calculator use cases. Use these as a sanity check on your calculator inputs.

ProjectDimensionsResult
8 × 8 ft × 4 in slab64 ft²0.79 yd³ · 48 bags 60lb · 36 bags 80lb
8 × 10 ft × 4 in slab80 ft²0.99 yd³ · 60 bags 60lb · 45 bags 80lb
10 × 12 ft × 4 in slab120 ft²1.48 yd³ · 90 bags 60lb · 67 bags 80lb
12 × 16 ft × 4 in slab192 ft²2.37 yd³ · 144 bags 60lb · 108 bags 80lb

2026 cost reference

Typical retail price range in the United States for shed foundation. Local pricing varies by region, supplier, and grade — confirm with two or three quotes before ordering.

Per cubic yard (delivered)

$135$180

Standard 3,000 PSI ready-mix in 2026. For shed pads under 1.5 yd³, expect a $60–$150 short-load fee. Bagged pre-mix breakeven: about 1 yd³.

Tips for accurate results

  • For sheds under 100 ft² in most U.S. jurisdictions, no permit is needed — but always check before pouring.
  • A compacted gravel pad (4 in of crushed stone) is a faster, cheaper alternative to concrete for prefab sheds. Drains better, costs 60–70% less.
  • For sheds on a slope, use pier blocks (concrete or precast) rather than a full slab — easier to level and skip frost-line digging.
  • Always slope the pad 1/4" per ft away from the shed door to prevent water pooling.
  • In freezing climates, a shed slab should sit on a 4-in compacted gravel base for drainage.

When to consult a pro

A small shed pad (under 100 ft²) is one of the more workable DIY concrete projects. The risks: getting the pad level (use a string line), preventing slab cracks (control joints every 8–10 ft, and proper curing for 7+ days), and drainage. For sheds over 12×16 or any heated/insulated structure, hire a pro — the extra precision pays back in flat surfaces and crack-free finishes.

FAQ

Frequently asked questions

  • A 10 × 12 ft × 4 in slab: 1.48 yd³, or about 90 bags of 60-lb pre-mix / 67 bags of 80-lb pre-mix. With 10% waste: order 1.6 yd³ of ready-mix or buy 100 / 75 bags.

Reference